Quote templates for roofing

Professional quotes for roof repairs, re-roofs, and flat roof waterproofing in Ireland.

6 min read

What to include in a roofing quote

Roofing jobs are among the most likely to end in a dispute if the quote isn't detailed enough. The work happens at height, in Irish weather, and often reveals problems only once the covering is off, so a clear itemisation of what's included, and what might come up as extra, matters more here than in most trades.

Start by naming the roof type: concrete or clay interlocking tile, natural slate, fibre cement slate, or flat roof with a felt or single-ply membrane. Each has a very different cost and installation method, so reference the material explicitly.

Itemise: strip-out of existing covering and skip/waste disposal (price per m² or per skip load), material supply (cost per m²), fitting labour (price per m²), timber batten and rafter repairs if needed, lead or zinc flashing and valleys (per linear metre), UPVC or aluminium gutters and downpipes if included, and ridge/verge finishing.

State the guarantee you're offering. A re-roof with a 10-year guarantee justifies a higher price and is a strong selling point. Include a separate line for scaffolding, since Irish clients rarely anticipate this cost and it can double the price of even a small repair.

Example quote for full re-roof

Typical job: full re-roof on a detached house, 130 m² of pitched roof area.

  • Strip-out of existing tiles and skip hire, 130 m² at €10/m²
  • Replacement of deteriorated battens and rafters (estimated 25%), 32 m² at €22/m²
  • Breathable roofing membrane, 130 m² at €4/m²
  • Concrete interlocking tile, 145 m² at €16/m² (includes 12% waste)
  • Lead flashing (valleys, wall abutments, chimney), 20 lm at €28/lm
  • UPVC gutters and fascia, 22 lm at €26/lm
  • UPVC downpipes, 3 runs x 6m at €14/m
  • Scaffolding erection and dismantling, 1 service at €900
  • Fitting labour and finishing, 130 m² at €24/m²

Materials subtotal: €7,314 | Labour: €3,120 | Scaffolding: €900 | Total excl. VAT: €11,334

A job of this size always warrants a written proposal sent via WhatsApp with an acceptance link. The client can share it with a partner or a sibling before deciding, without you having to sit in the kitchen while they think it over.

Start sending professional quotes today.

Free, no commitment, ready in 2 minutes.

Get started free

Spot repairs and flat roof waterproofing

Most roofing enquiries aren't full re-roofs. They're spot repairs: slipped or broken tiles, cracked flashing, a blocked gutter. These jobs carry a fixed cost for scaffolding or a tower that can outweigh the actual repair.

Be upfront with the client about this. A roof with 6 broken tiles might cost €280 to €420, not because of the repair itself but because of the access equipment needed to reach it safely. If the client is surprised by the price, they'll feel let down even if the work was fair.

For spot repairs, put a visible line for "access equipment/scaffold tower" at a fixed price. That way the client sees the access cost separately from the repair, and the total feels justified.

For flat roofs, Irish housing stock includes a lot of ageing felt roofs on extensions and dormers. A typical waterproofing job: strip-out of old felt (€8/m²), torch-on felt or single-ply membrane (€28/m² supplied and fitted), new roof edge trims (€18/lm), and a 10-year guarantee. A 20 m² flat roof extension typically runs €900 to €1,400 excl. VAT depending on access.

Tips for winning more roofing jobs

Before and after photos are your best sales tool. When you're up on the roof, photograph the problem areas. Send them with the quote link over WhatsApp. The client feels far more confident when they can actually see what you found.

On jobs above €3,000, a 30% deposit on acceptance, paid by bank transfer to your IBAN, is standard practice. State it plainly on the quote: "30% deposit on acceptance, balance on completion." With Prummo, the client sees your bank details directly on the quote page.

Build templates for your most common jobs: tile repairs, gutter replacement, flashing repair. When the next call comes in after a storm, adapt the template in two minutes instead of starting from scratch. Prummo lets you save and reuse templates, which matters most in the busy weeks after high winds.

Frequently asked questions

How do I quote when I won't know the state of the timbers until the roof is stripped?

Include an estimate for timber replacement in the quote with a clear note: "Replacement of deteriorated timbers is estimated at €X. The final figure will be confirmed once the roof is opened, and any additional work will be agreed with you before it proceeds." This protects both you and the client.

What guarantee should I offer on a re-roof?

A minimum of 2 years on workmanship is reasonable and matches standard consumer protection expectations in Ireland. For waterproofing and full re-roofs, 10 years is common practice among established roofers. State the guarantee explicitly on the quote. It's both a selling point and something the client will expect in writing.

Do I need planning permission to re-roof a house?

For a like-for-like re-roof using the same tile type, colour, and profile, planning permission generally isn't required under exempted development rules. Changes to roof material, colour, or pitch, or work on a protected structure, may need local authority approval. Tell the client it's their responsibility to confirm this with their local authority before work starts.

Free to start

The next quote doesn't wait until tonight. It goes out in 2 minutes.

Get started free

No credit card · No installation · Start in 2 minutes