Features

Kitchen, bathroom, bedroom: one single quote

Each room on the job gets its own subtotal, inside a single quote the client receives fully organised.

Subtotal per sectionSection templatesList or sections
Quote valueRย 103,680VAT included
4/6sections filled
1 to fill โ€บ2 without price โ€บ1 optional
Reorder
Kitchen8 items ยท 2 choicesRย 37,440
Bathroom6 itemsRย 29,760
Bedroom4 items ยท 2 without priceRย 14,280
Living room5 itemsRย 22,200
BalconyNot summed3 items ยท separate proposalRย 7,440
0ElectricsTap to add itemsFill in
+ Add section

One number at the top, always right

The quote value with tax included, and a bar per section: you see what is missing without opening anything.

Optional sections outside the total

The balcony stays a separate proposal. The client decides, the total never misleads.

The client reads room by room

Kitchen, bathroom, bedroom. Each with its subtotal, on the page and in the PDF.

01

Build the quote in sections

On the items step, switch between List and Sections with one tap, and nothing is lost if you switch back to a list. Each section shows its own subtotal, and the order you set is the order the client sees. Save any section as a template and reuse it on the next similar job.

Kitchen

8 items ยท subtotal Rย 37,440

6 sections

Remove worktop and tiles

1 job ร— Rย 4,560

Rย 4,560

Kitchen units (linear)

4.2 m ร— Rย 3,720

Rย 15,624

Silestone worktop

4.2 m ร— Rย 2,280

Rย 9,576

Fitting and adjustment

2 days ร— Rย 3,840

Rย 7,680
Add item to Kitchen

Reis Construction

2-bed flat renovation ยท Anna Farrell

Rย 103,680

Kitchen

8 items

Rย 37,440

Bathroom

6 items

Rย 29,760

Bedroom

4 items

Rย 14,280

Living room

5 items

Rย 22,200

Balcony (optional)

Separate proposal ยท not added to the total

+Rย 7,440
Accept quote ยท Rย 103,680

02

What the client sees

The 'What the client sees' card, on the review step, sums it all up in one sentence: how many items, in how many sections, and whether each item's price is shown. Turn 'Show item prices' and the 'Material / labour summary' on or off, then tap 'View as the client' to confirm. The PDF follows the same layout by section, and reads clearly even in black and white.

Flat renovationJobs across several roomsProposal with optional extras

Frequently asked questions

For anything else, message us on WhatsApp.

Can I go back to a simple list after creating sections?

Yes. The 'List / Sections' toggle works both ways, and nothing is lost in the switch. The items are simply reorganised, ready to go back into sections whenever you like.

Does the client see the price of each item inside the section?

It depends on the option you choose on the review step. You can show the price of each item inside the section, or just each section's subtotal, depending on what you switch on in the 'What the client sees' card.

Can I mark a section as optional?

Yes. Mark the section as a 'Separate proposal' and it appears to the client without being added into the total. It is useful for presenting an extra phase or additional work without changing the main value of the quote.

Can I reuse the same sections in other quotes?

Yes. Save any section as a template with its items already organised, and add it to a new quote in seconds. Prummo also suggests common sections by job type, without prices, to help you start faster.

Related content

Free to start

Try sectioned quotes

Try it now

Free, no commitment.