Quote templates for remodelling
Professional quotes for kitchen, bathroom, and interior renovation projects, priced in rand.
What to include in a remodelling quote
Renovations are high-value, complex jobs. A well-presented quote is what separates a trustworthy professional from a casual contractor. Customers who receive an organised, itemised proposal are calmer and less likely to renegotiate mid-job.
Always divide the quote by phase or trade: demolition and removal, structural or masonry work, services (electrical and plumbing where applicable), finishes (tiling, flooring), painting, and fittings and joinery. Each phase with its own subtotal.
Detail materials with specific brands and references wherever possible. Naming exact products reads as far more professional than vague line items, and lets the customer compare against what they've seen in showrooms.
Give an estimated timeline per phase. A kitchen renovation might take 3 weeks. If the customer is living in the house, knowing when they get their kitchen back matters. Build in a 2 to 3 day buffer.
Wherever there's a risk of extra work (damp in walls, old pipework, unknown structure behind tiling), flag it upfront. This prevents conflict when reality demands additional work.
Example quote for bathroom renovation
Typical job: full renovation of a 5.5 m² bathroom.
- Demolition and tile/floor removal, 5.5 m² at R280/m²
- Removal of existing sanitary ware, 1 service at R650
- Waterproofing of walls and floor, 20 m² at R180/m²
- Wall tile 300x600 (up to 1.8m height), 20 m² at R580/m² (material + install)
- Non-slip floor tile 300x300, 5.5 m² at R650/m² (material + install)
- Wall-hung toilet with in-wall cistern frame, 1 unit at R4,800 (supply + fit)
- Countertop basin with stone-look top, 1 unit at R5,200 (supply + fit)
- Single-lever mixer tap, 1 unit at R1,450 (supply + fit)
- Shower with tiled base and glass panel, 1 unit at R7,200 (supply + fit)
- Ceiling paint, prime + 2 coats, 5.5 m² at R125/m²
- Ceramic skirting (matching floor), 9 lm at R180/lm
Materials subtotal: R30,890 | Labour: R14,500 | Total excl. VAT: R45,390
How to present phasing and payment terms
Renovations above R30,000 should include a payment phasing proposal. It's not just about cash flow, it's protection for both parties.
A typical model:
- 30% on acceptance of the quote and before work starts
- 40% on completion of demolition and services
- 30% on completion and handover
This way you're never working unpaid, and the customer sees payments tied to real progress. With Prummo, request each stage payment via PayShap directly from the quote, no need to chase a bank transfer manually.
For jobs above R80,000, consider a simple one-page written agreement in addition to the quote: parties, scope, timeline, payments, and an additional-work clause. It doesn't need to be a lawyer's document; one clear page protects you and reassures the customer.
Tips for winning more remodelling jobs
Progress updates build trust during the job. Send photos of progress on WhatsApp without being asked. "Tiling finished today, sanitary ware going in next week" with a photo is the kind of update that generates referrals. The customer feels in control without having to check the site daily.
Build packages for your most common jobs: "bathroom renovation up to 5 m²", "standard kitchen refresh". A base price with a clear additional-work clause simplifies quoting and speeds up decisions.
Document before-and-afters. Professional photos of a well-executed renovation are your best marketing. Renovation customers ask family and neighbours for recommendations constantly, a gallery of previous work on your phone is worth more than paid ads.
Frequently asked questions
Should VAT be shown on remodelling quotes?
Only if you're registered for VAT with SARS. If you are, show it as its own line at the standard 15% rate so the customer sees the base price and the tax separately. If you're not registered, leave VAT off the quote entirely.
How do I handle extra work discovered mid-job?
Stop and communicate immediately. Never carry out extra work without approval. Send a description and price via WhatsApp, get written approval (a reply message is enough), then proceed. This protects you from payment disputes at the end.
How do I estimate the duration of a renovation?
Base it on similar past jobs. A full bathroom typically takes 10 to 15 working days with one team. A kitchen, 15 to 20 days. Always add 2 to 3 days as a buffer for the unexpected, and note on the quote that material delivery delays may affect the timeline. Customers accept this as reasonable protection.
How do my customers pay for a phased renovation?
Request each stage payment via PayShap sent straight to their banking app, or by EFT with proof of payment attached to the job. Cash is still common for smaller once-off jobs. There's no card checkout for South Africa.
Should I include a contingency line for unforeseen structural issues?
Yes, especially on older houses. A 10-15% contingency line, clearly explained as covering things like damp, old pipework, or unknown wiring, protects you and sets the right expectation before demolition starts.
Do I need to be registered with anyone to do remodelling work?
General building and renovation work has no single mandatory registration, but any electrical or plumbing portion must be done by someone properly registered (Department of Employment and Labour for electrical, PIRB for a plumbing Certificate of Compliance). Reference this on the quote if you subcontract those trades.