Diagnosis, cause, recommendation, and signed professional opinion. All generated from your phone.
J. Silva Painting
VAT number 1234567WA · Dublin
Technical report
RT-2026-0007 · 15 Sep 2026Defect
Damp and blistering paint on the living room wall by the window, over roughly 1 m².
Analysis
Water ingress through the unsealed exterior window frame. No sign of a pipe failure (pressure test normal).
Solution
Seal the frame with exterior silicone, 5 days drying, damp-proof primer and two coats of paint.


John Silva
Professional painter · digital signature · 15 Sep 2026, 16:42
The PDF the client, the insurer or the residents' association receives. Sample data.
Covers the site visit
A signed opinion justifies the diagnosis fee, even if the client does not go ahead.
Works for the insurer and the residents' association
Defect, analysis and solution in a PDF with date, photos and digital signature.
Comes out of the quote you already have
Client, site and materials come in on their own. You only dictate what you saw.
01
The right fields for a credible report: site description, identified problem, probable cause, technical recommendation, and final opinion. No Word templates, no rewriting from scratch for every client. Dictate each field by voice. Prummo structures the text into a formal report, ready to review and sign.
Technical report
Damp on the living room wall by the window, about a square metre, paint blistering. Coming from the unsealed frame, the pipework is fine. Seal it, let it dry, damp-proof primer and repaint.
Defect
Analysis
Solution
Photos (2)


Today
Technical_report_RT-2026-0007.pdf
2 pages · 412 KB · signed
Good afternoon Ana, here is the technical report on the damp in the living room, already signed. You can send it straight to the insurer. Let me know when to go ahead with the repair.
16:44 ✓✓
Perfect, thank you! Forwarded already. Can you book the 18th?
16:51
02
The report identifies the responsible tradesperson and generates a PDF with its own header, clear structure, and space for a signature. Credibility that justifies the value of your work to insurers, property managers, and demanding clients. The client receives a document on par with an engineering firm, created by you in minutes.
For anything else, message us on WhatsApp.
A technical report documents a professional diagnosis about a situation on site: the state of an installation, the cause of a fault, an opinion on a repair. It's used to justify work to clients, insurers, property managers, or in court.
It includes site description, identified problem, probable cause, technical recommendation, and final opinion, along with the responsible tradesperson and client details. You can also add site photos and your logo.
Yes. Each field accepts voice dictation. The text is structured into formal language while keeping your technical vocabulary.
The report is a technical document signed by the responsible tradesperson and carries the same value as a written opinion. For court or insurance situations, confirm any specific requirements with the recipient.
Free to start
Free, no commitment. Ready in 2 minutes.